| A view from a tree
showing the new drainage ditches and the dining shelter
having a new roof fitted |
Phil, one of our Crew
members digging in new drainage, you can see the tent
frames showing positioning in the background |
Ross digging in one of
the main drainage arteries showing a coil of land
drainage pipe in the background |
Another aerial view
showing the layout of the tents and the drainage
channels going in. |
| |
|
|
|
 |
 |
 |
 |
| The inside of the dining
shelter now clad in timber and receiving its second coat
of paint |
Inside again noting the
window frame stripped back ready to repaint and the hot
water boiler hung ready for plumbing in |
Mick up a ladder outside
re-staining the exterior of the building to protect it
as well as making it look more presentable |
Might look a mess at the
moment but this is where the services feed into the
building. From nothing, this will now have gas,
electricity and water |
| |
|
|
|
 |
 |
 |
 |
| Note the new felt roof
and barge boards |
The drainage ditches now
on the field with the drainage pipe installed and topped
with rocks and gravel |
Showing the drainage
pipes across the field and how they join. This should
make the field a lot drier underfoot |
Inside the old dining
shelter showing the new cupboards and worktop by the
opening hatch. Space for fridge & freezer underneath |
| |
|
|
|
 |
 |
 |
 |
| In goes the new
stainless steel sink and one of the worktops, note the
new water boiler for permanent hot water for washing-up |
The rear wall of the
kitchen with plenty of storage space and worktop, the
gap is for the brand new 6-burner cooker to slide in |
The old path to the
dining shelter reclaimed. Had overgrown to 6" wide but
now uncovered and about to be re-fravelled |
Stig sorting out the gas
connection to the main bulk tank ready to feed the new
building |
| |
|
|
|
 |
 |
 |
 |
| Dreadnought ESU busy
refurbishing the old camp beds ready to have new canvas
fitted to them. These will be going in the tents |
Jim lining the trenches
with rocks for drainage before they're filled in |
Most trenches now filled
in ready to re-seed the ground in April |
Might look far from
perfect now but once raked & re-seeded and the growth is
back it should look superb |
| |
|
|
|
 |
 |
 |
 |
| The new cooker is moved
in and sink unit now in position ready for plumbing in |
Brand new fridge &
freezer delivered and installed under the worktop |
Still a building site
but really starting to take shape now |
Laminate flooring now
laid and job done ready for use |
| |
|
|
|
 |
|
|
|
| The outside of the
kitchen diner all now complete |
|
|
|